| Research Investigation 99-023 | February, 2001 |
Analysis
Of PCC Pavement Rehabilitation In MissouriProject Description:
Missouri has been an active participant in the national Long Term Pavement
Performance (LTPP) program since 1990. Existing and specially built pavements
around Missouri were designated as LTPP sections. Performance data has been
collected annually on these sections. Some of the sections were originally
Portland cement concrete (PCC) pavements that underwent different forms of
rehabilitation. A point in time had been reached at which it was believed an
adequate amount of information was available to develop rudimentary performance
conclusions.
Analysis of these rehabilitated PCC pavements was performed under contract in 2000 by ERES Consultants, a Division of Applied Research Associates, Inc. Four Specific Pavement Study (SPS) sites, consisting of multiple test sections built specifically for the LTPP program, and five General Pavement Study (GPS) sites, consisting of single existing test sections, were examined. Because of the greater wealth of data generated under controlled circumstances in the extensive testing arenas at the SPS sites, substantially more emphasis was placed on these in the analysis.
The SPS test site constructed in 1991 on I-35 near Bethany included sections that were rubblized, break and seated, undersealed, and diamond ground. Most of the sections were overlaid with varying thicknesses of asphalt concrete (AC). Some were fitted with edge drains. Joints were resealed on three of the bare PCC sections. One section had its AC overlay sawed and sealed over the old joint locations.
The SPS test site constructed in 1990 on US 67 near Festus was composed primarily of bonded PCC sections. They varied by type of surface preparation and PCC overlay thickness. (A more thorough examination of the total bonded PCC overlay experiment project on US 67, of which the SPS site was only part, is available in RDT Report 00-002A.)
The SPS site constructed in 1996 on US 65 north of Sedalia contained Missouri's first Superpave overlays. The test sections varied by mix design and binder grade.
The SPS site constructed in 1998 on Rt. 8 near Potosi was similar in composition to the I-35 site; however, there were no rubblized test sections.
Data collected at these sites included ride, rutting and other surface distresses, deflection testing, and traffic loadings.
Observations and Conclusions:
The I-35 SPS site yielded the most pertinent information.
Comparing the cost effectiveness of every rehabilitation strategy to each other was difficult because of the different inherent distresses, especially between bare PCC and AC overlaid PCC. The only universal performance measure was ride or IRI. Therefore, the following ratio was employed:
Cost effectiveness = (Cost Option I - Cost Control)/(IRI Control - IRI Option I)
Although this method of comparing test sections was considered the best available, it had one serious limitation. Lack of uniformity in original PCC condition required a much greater repair investment in some test sections than others. This skewed the cost-effectiveness. If initial conditions had been nearly identical, as was the original intent of the LTPP program, the order of cost-effectiveness would have been markedly rearranged.
The US 67 SPS site provided insight to a lesser-used rehabilitation technique.
Historical performance data was limited for the US 65 and Rt. 8 sites due to their recent construction. Therefore, performance trends for these were inconclusive.
Recommendations:
This study should be used as the foundation for future analysis of PCC pavement
rehabilitation sites in Missouri. The performance trends have already shed light
on the short-term applicability of certain strategies. At present, however, the
LTPP test sections have not matured enough to provide reliable
cost-effectiveness comparisons with each other.
Contact:
John Donahue
Phone: (573) 526-4334
Email: donahj@mail.modot.state.mo.us